client login driver login


2022 Model Year Initial Order Dates/Job#1 Dates

 

Initial 2022 Order Date is the date that the manufacturer's ordering system will allow placement of 2022 model year orders. The Job #1 Date is the date

production is scheduled to begin for that particular model. In lieu of a Job #1 Date some manufacturers provide a month that deliveries will begin.

 

Stellantis

Dodge

Model

Assembly Plant

Initial 2022 Order Date

Job #1 Date

Challenger

Bramelea, Canada

10/08/21

12/27/21

Charger

Bramelea, Canada

10/08/21

12/27/21

Charger Pursuit

Bramelea, Canada

TBD

12/27/21

Durango

Detroit, MI (Jefferson North)

10/08/21

12/14/21

Durango Pursuit

Detroit, MI (Jefferson North)

TBD

12/14/21

 

Ram

Model

Assembly Plant

Initial 2022 Order Date

Job #1 Date

ProMaster City

Tofas, Turkey

11/10/21

January

ProMaster

Saltillo, Mexico

08/27/21

11/22/21

1500 Regular Cab & Crew Cab Pickup (DS)

Saltillo, Mexico

09/03/21

11/08/21

1500 Quad Cab & Crew Cab Pickup (DS)

Warren, MI

09/03/21

11/24/21

1500 Quad Cab & Crew Cab Pickup (DT)

Sterling Heights, MI

06/14/21

09/13/21

2500 Pickup (DJ)

Saltillo, Mexico

06/14/21

08/09/21

3500 Pickup (D2)

Saltillo, Mexico

06/14/21

08/09/21

3500 Cab Chassis (DD)

Saltillo Mexico

06/14/21

08/09/21

4500/5500 Cab Chassis (DP)

Saltillo, Mexico

06/14/21

08/09/21

 

Chrysler

Model

Assembly Plant

Initial 2022 Order Date

Job #1 Date

300

Bramelea, Canada

10/08/21

12/27/21

Voyager

Windsor, Canada

08/16/21

11/15/21

Pacifica

Windsor, Canada

08/16/21

11/15/21

Pacifica PHEV

Windsor, Canada

08/16/21

11/1521

 

Jeep

Model

Assembly Plant

Initial 2022 Order Date

Job #1 Date

Renegade

Melfi, Italy

09/03/21

September

Compass

Toluca, Mexico

08/05/21

10/01/21

Wrangler

Toledo, OH

10/08/21

12/09/21

Gladiator

Toledo, OH

10/08/21

11/22/21

Cherokee

Belvidere, IL

11/10/21

01/03/22

Grand Cherokee (WK)

Detroit, MI (Jefferson North)

10/08/21

12/14/21

Grand Cherokee (WL74) - all new 5 passenger

Detroit, MI (Mack)

09/03/21

10/04/21

Grand Cherokee L (WL75) - all new 7 passenger

Detroit, MI (Mack)

10/08/21

11/16/21

Wagoneer/Grand Wagoneer - new model

Warren, MI

06/14/21

06/03/21

Initial Order Date and Job #1 Date updated 10/06/21

 

Ford Motor Company

Ford

Model

Assembly Plant

Initial 2022 Order Date

Job #1 Date

Mustang

Dearborn, MI

10/11/21

01/03/22

Mustang Mach-E - no fleet allocation

Cuautitlan, Mexico

09/29/21

11/29/21

Police Interceptor Utility

Chicago, IL

08/16/21

11/02/21

Police Interceptor Utility - VSO

Chicago, IL

08/09/21

11/08/21

Edge

Oakville, Canada

08/30/21

10/29/21

EcoSport

India

10/13/21

12/01/21

Escape

Louisville, KY

08/16/21

11/02/21

Bronco Sport

Wayne, MI

08/30/21

10/29/21

Bronco

Wayne, MI

09/13/21

12/13/21

Explorer

Chicago, IL

08/16/21

11/02/21

Expedition

Louisville, KY

10/13/21

01/18/22

Maverick

Hermosillo, Mexico

06/08/21

08/18/21

Ranger

Wayne, MI

09/27/21

12/13/21

F-150

Dearborn, MI

Kansas City, MO

09/30/21

09/30/21

11/15/21

12/06/21

F-150 VSO

Dearborn, MI

Kansas City, MO

10/15/21

10/15/21

01/10/22

01/10/21

F-150 Lightning

Dearborn, MI

TBD

TBD

F-Series Super Duty

Louisville, KY

03/15/21

07/09/21

F-Series Super Duty VSO

Louisville, KY

04/26/21

07/05/21

F-Series Super Duty

Avon Lake, OH

03/15/21

07/22/21

Medium Truck

Louisville, KY

10/23/20

01/04/21

Motorhome

Louisville, KY

09/22/21

12/13/21

Transit Connect

Valencia, Spain

01/25/21

04/19/21

Econoline Cutaway/Stripped Chassis

Lorrain, OH

10/12/20

01/04/21

Transit

Kansas City, MO

09/10/21

11/23/21

Transit VSO

Kansas City, MO

09/12/21

12/06/21

E-Transit

Kansas City, MO

06/21/21

11/15/21

 

Lincoln

Model

Assembly Plant

Initial 2022 Order Date

Job #1 Date

Corsair

Louisville, KY

08/16/21

11/02/21

Nautilus

Oakville, Canada

08/29/21

10/18/21

Aviator

Oakville, Canada

03/15/21

08/30/21

Navigator

Louisville, KY

10/13/21

01/18/22

Initial Order Date and Job #1 Date updated 10/11/21

 

General Motors Company

Buick

Model

Assembly Plants

Initial 2022 Order Date

Job #1 Date

Encore

Bupyong, South Korea

02/11/21

05/03/21

Encore GX

Bupyong, South Korea

02/11/21

04/05/21

Envision

Dongyue, China

03/25/21

07/19/21

Enclave

Lansing, MI

06/03/21

10/16/21

 

Cadillac

Model

Assembly Plant

Initial 2021 Order Date

Job #1 Date

CT4

Lansing, MI

08/12/21

10/21/21

CT5

Lansing, MI

08/12/21

10/21/21

XT4

Fairfax, KS

08/08/21

11/08/21

XT5

Spring Hill, TN

05/06/21

06/24/21

XT6

Spring Hill, TN

05/06/21

06/24/21

Escalade/Escalade ESV

Arlington, TX

08/19/21

10/06/21

2022MY Escalade/Escalade ESV models will be allocated for the entire 2022 model year. Further information will be available by August.

 

 

Chevrolet Cars & Trucks

Model

Assembly Plant

Initial 2022 Order Date

Job #1 Date

Spark

South Korea

04/08/21

06/07/21

Bolt EV

Orion, MI

02/25/21

04/19/21

Bolt EUV

Orion, MI

02/25/21

05/10/21

Malibu

Fairfax, KS

04/22/21

12/10/21

Camaro - executive delivery only

Lansing, MI

04/08/21

08/17/21

Corvette - executive delivery only

Bowling Green, KY

07/01/21

09/15/21

Trax

SLP (Mexico)

02/11/21

04/05/21

Trailblazer

South Korea

02/11/21

04/05/21

Equinox

CAMI (Canada)

SLP (Mexico)

Ramos, Mexico

04/08/21

06/22/21

Blazer

Ramos, Mexico

05/06/21

08/09/21

Traverse

Lansing, MI

06/03/21

10/15/21

Tahoe

Arlington, TX

08/19/21

10/06/21

Tahoe - Police

Arlington, TX

08/19/21

10/06/21

Suburban

Arlington, TX

08/19/21

10/06/21

Colorado

Wentzville, MO

08/19/21

08/26/21

Silverado LD Regular Cab

Silao, Mexico

Ft. Wayne, IN

09/02/21

10/06/21

Silverado LD Double Cab

Silao, Mexico

Ft. Wayne, IN

09/02/21

10/14/21

Silverado LD Crew Cab

Silao, Mexico

Ft. Wayne, IN

09/02/21

10/05/21

Silverado HD Regular Cab

Flint, MI

08/19/21

07/12/21

Silverado HD Double Cab

Flint, MI

08/19/21

07/12/21

Silverado HD Crew Cab

Flint, MI

08/19/21

07/12/21

Silverado Medium Duty

Springfield, OH

09/23/21

01/03/22

2023 LCF 3500/4500 Gas

Japan

07/01/21

11/01/21

LCF 4500HD/XD & 5500 HD/XD Diesel

Japan

09/15/20

01/05/21

LCF 6500 XD Diesel

Japan

08/15/21

10/01/21

Express Cargo

Wentzville, MO

09/02/21

11/19/21

Express Passenger

Wentzville, MO

09/02/21

11/19/21

Express Cutaway

Springfield, OH

09/02/21

11/19/21

2022MY Colorado, LD & HD Silverado, Express, Tahoe/Suburban models will be allocated for the entire 2022 model year - see Allocation Process below.

 

Controlled Fleet Allocation Process for Select 2022MY General Motors Vehicle Lines

 

Fleet allocation will be controlled for select 2022MY vehicle lines.  Order dates have been delayed due to the industry-wide semiconductor chip shortages.

 

The regional fleet director and commercial zone manager teams will be provided their specific allocation volumes, by vehicle line, on Monday, August 16, 2021.

 

Allocation will be approved at the customer level (FAN).  The regions will provide GM Fleet central office in Detroit a weekly spreadsheet with the allocation volume, by vehicle line for each FAN approved.

 

GM dealers will not be able to enter an order for a controlled allocation vehicle line unless the FAN is loaded/approved in the system.  Quantities will be monitored for compliance and cancelled without notice if more than the approved volume is submitted.

 

 

GMC Truck

Model

Assembly Plant

Initial 2022 Order Date

Job #1 Month

Terrain

SLP (Mexico)

04/08/21

06/22/21

Acadia

Spring Hill, TN

05/06/21

06/24/21

Yukon

Arlington, TX

08/19/21

10/06/21

Yukon XL

Arlington, TX

08/19/21

10/06/21

Canyon

Wentzville, MO

08/19/21

08/26/21

Sierra LD Regular Cab

Silao, Mexico

Ft. Wayne, IN

09/02/21

10/05/21

Sierra LD Double Cab

Silao, Mexico

Ft. Wayne, IN

09/02/21

10/14/21

Sierra LD Crew Cab

Silao, Mexico

Ft. Wayne, IN

09/02/21

10/05/21

Sierra HD Regular Cab

Flint, MI

08/19/21

07/12/21

Sierra HD Double Cab

Flint, MI

08/19/21

07/12/21

Sierra HD Crew Cab

Flint, MI

08/19/21

07/12/21

Savana Cargo

Wentzville, MO

09/02/21

11/19/21

Savana Passenger

Wentzville, MO

09/02/21

11/19/21

Savana Cutaway

Springfield, OH

09/02/21

11/19/21

2022MY Canyon, LD & HD Sierra, Savana, Yukon/Yukon XL models will be allocated for the entire 2022 model year - see Allocation Process below.

 

Controlled Fleet Allocation Process for Select 2022MY General Motors Vehicle Lines

 

Fleet allocation will be controlled for select 2022MY vehicle lines.  Order dates have been delayed due to the industry-wide semiconductor chip shortages.

 

The regional fleet director and commercial zone manager teams will be provided their specific allocation volumes, by vehicle line, on Monday, August 16, 2021.

 

Allocation will be approved at the customer level (FAN).  The regions will provide GM Fleet central office in Detroit a weekly spreadsheet with the allocation volume, by vehicle line for each FAN approved.

 

GM dealers will not be able to enter an order for a controlled allocation vehicle line unless the FAN is loaded/approved in the system.  Quantities will be monitored for compliance and cancelled without notice if more than the approved volume is submitted.

 

Initial Order Date and Job #1 Date updated 09/15/21

 

Hyundai Motor America

Hyundai

Model

Assembly Plant

Initial 2022 Order Month

Job #1 Month

Accent

Mexico

03/21

07/21

Ioniq Electric *see note below

Ulsan, South Korea

03/21

06/21

Ioniq Hybrid

Ulsan, South Korea

03/21

06/21

Ioniq Plugin Hybrid

Ulsan, South Korea

03/21

06/21

Elantra

Montgomery, AL

Ulsan South Korea

03/21

06/21

Sonata

Montgomery, AL

04/21

06/21

Sonata Hybrid

Ulsan, South Korea

04/21

06/21

Kona

Ulsan, South Korea

12/20

03/21

Kona EV *see note below

Ulsan, South Korea

12/20

03/21

Venue

Ulsan, South Korea

05/21

06/21

Tucson - all-new

Ulsan, South Korea

11/20

02/21

Nexo - CA only

South Korea

05/21

08/21

Santa Cruz

Montgomery, AL

03/21

06/21

Santa Fe

West Point, GA

01/21

06/21

Palisade

Ulsan, South Korea

03/21

06/21

First deliveries to dealers are normally 60-90 days after the Job#1 month

 

*Available for delivery in the following states: California, Connecticut, Delaware, Maine, Maryland, Massachusetts, New Jersey, New Mexico, New York, Oregon, Pennsylvania, Rhode Island, Vermont, and Washington

 

Initial Order Date and Job #1 Date updated 03/10/21

 

Kia Motors America

Model

Assembly Plant

2022 Start of Production

Month 2022 Deliveries Begin

Soul

South Korea

05/01/21

08/21

Rio

South Korea

10/01/21

12/21

Forte

Mexico

10/01/21

12/21

K5

West Point, GA

05/01/21

07/21

Niro

South Korea

2nd Half 2021

TBD

Niro Hybrid

South Korea

2nd Half 2021

TBD

Niro EV *see note below

South Korea

2nd Half 2021

TBD

Seltos

South Korea

06/21

9/21

Sportage

West Point, GA

05/21

07/21

Sorento

West Point, GA

07/01/21

09/21

Sorento HEV

South Korea

07/01/21

10/21

Telluride - no fleet allocation

West Point, GA

TBD

TBD

Carnival - all-new Sedona replacement - no fleet allocation

South Korea

02/21

06/21

*Available for delivery in the following states: California, Connecticut, Delaware, Maine, Maryland, Massachusetts, New Jersey, New Mexico, New York, Oregon, Pennsylvania, Rhode Island, Vermont, and Washington

 

SOP Date and Month Deliveries Begin Date updated 08/16/21

 

 

Mazda USA

Model

Assembly Plant

Initial 2022 Order Month

Month 2022 Deliveries Begin

Mazda3 Sedan

Hofu, Japan

10/04/21

03/22

Mazda3 Hatchback

Hofu, Japan

10/04/21

03/22

MX-5 Miata

Hiroshima, Japan

10/04/21

03/22

MX30 EV - CA only

Hiroshima, Japan

07/01/21

12/21

CX30

Hiroshima, Japan

11/01/21

04/22

CX5

Hiroshima, Japan

10/04/21

03/22

CX9

Hiroshima, Japan

10/04/21

03/22

 

Nissan USA

Nissan

Model

Assembly Plant

Initial 2022 Order Date

Month 2022 Deliveries Begin

Leaf

Japan

01/15/21

06/21

Versa Sedan

Aguascalientes, Mexico

07/15/21

01/22

Sentra

Aguascalientes, Mexico

06/15/21

12/21

Altima Sedan

Smyrna, TN

Canton, MS

05/15/21

09/21

Maxima

Smyrna, TN

08/15/21

12/21

Z Coupe

Japan

08/15/21

02/22

Kicks

Japan

08/15/21

12/21

Rogue Sport

Japan

08/15/21

02/22

Rogue

Smryna, TN

06/15/21

10/21

Frontier

Smyrna, TN

04/15/21

09/21

Pathfinder

Smryna, TN

01/15/21

05/21

Murano

Canton, MS

06/15/21

10/21

Titan

Canton, MS

09/15/21

02/22

Armada

Japan

02/15/21

08/21

 

 

Infiniti

Model

Assembly Plant

Initial 2022 Order Month

Month 2022 Deliveries Begin

Q50 Sedan

Japan

03/15/21

09/21

Q60 Sedan

Japan

03/15/21

09/21

QX50 Crossover

Japan

06/15/21

11/21

QX55 Crossover/Coupe

Japan

12/15/20

04/21

QX60 Midsize SUV

Smyrna, TN

03/15/21

08/21

QX80 Full Size SUV

Japan

03/15/21

09/21

Nissan & Infiniti Initial Order Date and Job #1 Date updated 04/07/21

 

 

Subaru of America

Model

Assembly Plant

Initial 2022 Order Date

Month 2022 Deliveries Begin

Impreza

Japan

Mid-June

September

Legacy

Lafayette, IN

04/19/21

July

Outback

Lafayette, IN

Mid-April

July

Forester

Japan

Late August

December

Crosstrek

Japan

Late October

February

Crosstrek Hybrid - no fleet allocation - retail only

Japan

Late October

February

Ascent

Lafayette, IN

Mid-July

October

2022 tentative pricing will be released on or about the Initial 2020 Order Date

 

 

Toyota Motor Sales

Model

Assembly Plant

Initial 2022 Order Date

Month 2022 Deliveries Begin

Prius

Mexico

06/21

08/21

Prius Prime

Japan

06/21

08/21

Corolla

Cambridge, Ontario

06/21

08/21

Corolla Hybrid

Cambridge, Ontario

06/21

08/21

Corolla Hatchback

Cambridge, Ontario

07/21

10/21

Corolla Cross

 

08/21

10/21

Supra

Graz, Austria

07/21

12/21

Camry

Georgetown, KY

Lafayette, IN

07/21

09/21

Camry Hybrid

Georgetown, KY

07/21

09/21

Mirai - only available in CA from select dealers

Japan

08/21

10/21

Avalon

Georgetown, KY

07/21

09/21

Avalon Hybrid

Georgetown, KY

07/21

09/21

Sienna

Princeton, IN

08/21

10/21

C-HR

Turkey

12/21

02.22

RAV4

Woodstock, Ontario

11/21

01/22

RAV4 Hybrid

Woodstock, Ontario

11/21

01/22

RAV4 Prime

Woodstock, Ontario

12/21

02/22

Venza

Japan

12//21

02/22

4Runner

Japan

08/21

10/21

Highlander

Princeton, IN

09/21

11/21

Highlander Hybrid

Princeton, IN

09/21

11/21

Sequoia

Princeton, IN

07/21

09/21

Tacoma

San Antonio, TX

Baja, Mexico

08/21

10/21

Tundra

San Antonio, TX

11/21

01/22

Toyota Initial Order Date and Delivery Dates updated 10/11/21

 

Important 2022MY Information. Toyota lists the following statement for ALL 2022 MY Toyota vehicles on the October Fleet Production Letter: Limited Availability: Production and delivery dates cannot be guaranteed and subject to change without notice

 

IMPORTANT ALLOCATION INFORMATION

Toyota is allocating the models listed below for the 2022 model year. Allocation is based upon the average number that an end-user acquired in the past 2 years. Based on what we have seen, the end-user must have acquired at least 10 or more of a particular model in the previous 2 model years to qualify for allocation for the 2022 model year.

 

RAV4

RAV4 Hybrid

Highlander

Highlander Hybrid

Sienna

Tacoma

 

Volkswagen of America

Model

Assembly Plant

Initial 2022 Order Date

First 2022 MY Production Date

Estimated First Dealer Deliveries

ID.4 RWD*

Zwickau, Germany

TBD

12/20/21

02/28/22

ID.4 AWD*

Zwickau, Germany

TBD

12/20/21

02/28/22

GTI

Wolfsburg, Germany

08/09/21

10/04/21

11/15/21

Jetta

Puebla, Mexico

07/12/21

01/10/22

02/14/22

Arteon

Emden, Germany

07/12/21

11/10/22

02/14/22

Taos FWD

Puebla, Mexico

10/20/20

02/08/21

06/07/21

Taos AWD

Puebla, Mexico

02/08/21

05/03/21

06/28/21

Tiguan

Puebla, Mexico

05/10/21

08/16/21

09/13/21

Atlas

Chattanooga, TN

05/31/21

09/06/21

09/20/21

Atlas Cross Sport

Chattanooga, TN

05/31/21

09/06/21

09/20/21

*MY22 ID.4 - anticipated fleet availability in Q3-Q4 of 2022.

 

Revised 10/11/21

 

Auto Order | Featured Vehicle | News | About Us | Contact Us | Site Map | Industry Links | Home
© Copyright 2021 Napleton Fleet Group. All rights reserved.